Complete this task to create a scheduled report execution in Connect. Reports can be scheduled for a single, specific time or on a recurring basis.
A maximum of 10 reports can be scheduled at a time. |
Instructions | Additional Information | ||
---|---|---|---|
1 | From the Reports / Modern tab, select the report you would like to schedule. | ||
2 | Click Schedule. The Schedule Job window opens with the Criteria tab displayed. |
| |
3 | Enter the relevant criteria in the Criteria tab. |
| |
4 | Click the Schedule tab. | ||
5 | Enter the Configuration information for the scheduled report:
|
| |
6 | Enter the Notification information for the scheduled report:
|
| |
7 | Click Save. |
|
Not applicable for this topic |