Overview
The Concurrency Schemes page contains a list of all existing concurrency schemes. The page is used to manage concurrency schemes and set the default concurrency scheme for all plans. The default plan can be overridden during plan configuration to use a different concurrency scheme.
Field Definitions
Field | Type | Required | Description |
---|---|---|---|
Default | Radio Button | Yes | The flag that indicates that the specified concurrency scheme is the one used for all plans. |
Scheme Name | Display Only (Pulled from created/updated Concurrency Schemes) | Yes | The name of the concurrency scheme established in the concurrency scheme configuration. |
Description | Display Only (Pulled from created/updated Concurrency Schemes) | No | The description of the concurrency scheme established in the concurrency scheme configuration. |
Button Descriptions
Button | Shortcut Keys | Description | Step-By-Step Guides |
---|---|---|---|
Create | [Alt] + [C] | Add a new collection letter to the table. | Configuring Concurrency Schemes |
Update | [Alt] + [U] | Change the collection letter template details. | Updating Concurrency Schemes |
Delete | [Alt] + [D] | Removes the concurrency scheme from the master list. | Deleting Concurrency Schemes |
Clone | [Alt] + [N] | Creates a copy of a concurrency scheme. | Cloning Concurrency Schemes |